Three separate rough machining
steps (two screw holes and the drill point) for this large a
production run will cost much more than the upfront tool cost of a fourth
movable slide.
Also a rough machining
step has a greater risk of off-spec tolerances on the features, which
may increase the scrap rate in the production run. |